What problem need to pay attention to the tee?

(1) First determine whether the medium to be controlled is oil or water.

(2) Calculate the flow m3/h of the controlled medium.

(3) According to the controlled medium and its design flow to select the three-way thermostat valve diameter.

The tee fitting is a kind of pipe fitting, and its connection form is directly welding the tee with the steel pipe.

Due to the use of a heated tee, the tonnage of the equipment required for material formation is reduced. The hot-pressed three-way material has a wide adaptability to the material and is applicable to the materials of low-carbon steel, alloy steel, and stainless steel. In particular, the large-diameter and thick-walled tee are generally used in this forming process.